June 29, 2002. Finally the mud hole is gone. An exposed aggregate side walk is poured by Foltz Construction. Shown here doing the final step is Greg Foltz and his assistant Dawn. Greg is doing the wash down of the concrete to expose the aggregate. The landscaping department (Linda) will be putting in a rockery and a flower bed to the right of the sidewalk